how would you drywall this?

kevek101's picture

Looking for some general drywall advice from folks who know more then I do. We are drywalling garage ceiling. Joists are 2x6 12OC. 

-Since joists are so close do I need to use 1x3 strapping? 

-Would you hang ceiling before walls, or vice versa?

-And for bonus points, does code require drywall or cold we use plywood? There will be a living space above, but the garage will have a woodshop so preferably we’d hang something more durable. 

Thanks

Code requires a firewall (post #216064, reply #1 of 6)

Code requires a firewall (such as fire-rated drywall) between a garage and inhabited space.


Of all the preposterous assumptions of humanity over humanity, nothing exceeds most of the criticisms made on the habits of the poor by the well-housed, well-warmed, and well-fed.  --Herman Melville

Thanks Dan. Any thoughts on (post #216064, reply #2 of 6)

Thanks Dan. Any thoughts on the strapping?

It’s my understanding that (post #216064, reply #3 of 6)

It’s my understanding that strapping reduces the amount of movement the drywall be exposed to.  It can help eliminate cracks in the future when the joists sag (they’ll have a tiny amount of flex when the upstairs is occupied).  Since this is a woodshop you may not care what the drywall looks like after 3, 5, 10, etc years.  It also gives a wider nailing surface for your drywall, not the biggest deal but easier than trying to catch half of a 2x6 on edge.  Have you thought of using resilient channel for your strapping?

 

All in all I don’t think you NEED to strap, but it couldn’t hurt.

Cracks from deflection and (post #216064, reply #4 of 6)

Cracks from deflection and dinged drywall is a little bit of a concern. That’s part of the reason I wanted to use plywood on walls and ceiling. If the strapping helps I may run with that. Resilient channels have definitely been a consideration, as has a continuous layer of rigid, and quiet rock. Just trying to understand requirements and best practices before deciding which direction to go. 

with regard to what comes first, walls or ceilings, I see mixed approaches online. Most likely going to be filling bays between joist with cellulose, so if there is strapping to contend with it seems like doing ceiling first might make sense?

Kev (post #216064, reply #5 of 6)

Ceiling first.

A Great Place for Information, Comraderie, and a Sucker Punch.

Remodeling Contractor just outside the Glass City.


http://www.quittintime.com/

 


ceiling drywall (post #216064, reply #6 of 6)

kevek,

 Sheath the ceiling with 5/8 firecode, per code, and hang ceiling first, strapping will help deter cracking over time,

your call on that one

Geoff