can anyone tell how much sub floor I need under 3/4 in. pine flooring.
I have 1/2 in. plywood on 16 in. centered floor joist toped with 5/8 in. particle board. I want to take out the
Discussion Forum
Discussion Forum
Up Next
Video Shorts
Featured Story
By considering things like energy-efficient mechanicals, window orientation, and renewable energy sources, homes can be evaluated to meet the energy codes. Here's what the IRC has to say.
Featured Video
How to Install Cable Rail Around Wood-Post CornersHighlights
"I have learned so much thanks to the searchable articles on the FHB website. I can confidently say that I expect to be a life-long subscriber." - M.K.
Replies
*
Brac,
That 1/2" ply has to be spongy when you walk on it without any other top as a subfloor???
If it were me, I'd add a layer of 3/4" ply on top of the 1/2" before I laid my finish floor. If not that, at least another layer of 1/2" or you're going to have squeaks and soft spots.
Run the subsequent layer of ply perpendicular to the bottom layer.
Mike
*There is a code requirement. If you lack a code book, call the inspector.
*Brac, Since you are removing 5/8 PB, replace it with 5/8cdx. Like Michael said, your floor will be spongy if you do not. Also you will not have as good holding on nailing, with only 1/2" .I respectfully disagree with Michael on direction of running the new cdx however. I would run the new course of plywood perpendicular with the joists. I would stagger my joints and seams with the original course. Run rosin paper between courses to help minimize squeaks. Use a 8d screw shank nail for fastening and nail well.Run your flooring perpendicular to the joists as well.walk gooddavid