Wood Floor Prep
Have a room 15' x 13' with 9.5" Boise Cascade 45 series joists 16" oc that run across the 15' span. Looks to be 1/480 design. The underside of the joists are open. Joists are supported by 6' plates at each end. The floor is sheathed with 23/32" OSB glued/nailed per code. I would like to run a 3/4" engineered floor - (5" wide Baltic ply base with 4mm veneer) parallel to the joists for visual reasons. Floor will be stapled/glued. Should I add a 3/8" ply subfloor, glued/nailed? I have access to the underside so would it be as good to add 2x strapping on 24" centers perpendicular to the joists to stiffen the floor? This is an expensive floor so I want to make sure it's done right.
Thanks
Forum Topics
Breaktime
Project House Q&A Photo Gallery General Discussion Construction Techniques Energy, Heating & Insulation Business Tools for Home Building Green Building Reader Classified Help Wanted Work Wanted Breaktime Fests The Woodshed Tavern The ArchivesHelp/Feedback
Forum Suggestions Feedback on Fine Homebuilding The Editor's CornerInspired House
General Discussion Reader Tips Interior Decorating Design Talk Building and Remodeling Ideas Kitchen and Bath Outdoor Living Material Choices Photo GalleryCurrent Issue
Member Visits
davidmeiland
-
15 min ago
qczhucdop
-
36 min ago
chusterfield
-
2 hours ago
kostello
-
2 hours ago
gfretwell
-
3 hours ago
DaveyG
-
4 hours ago
jimblodgett
-
4 hours ago
junkhound
-
4 hours ago
sammiesoo
-
5 hours ago
Jimgentry
-
5 hours ago

All How-To Topics
































The strapping will make the (post #205576, reply #1 of 1)
The strapping will make the system stiffer
No problem runninhg thre floorin parallel to joists
or try this site for the whole gang
http://forums.delphiforums.com/breaktimeclass/start