Search the forums
Loading
Tile
My question: will tile hold up when applied on top of 3/4" thin set poored over radiat pipes and plastic snap panel? Sub panel consists of 3/4" sheets. Floor has been poored for over a month, extremly hard, and level. Note, I do not have the [space] to apply a layer of schluter floor material.
Forum Topics
Breaktime
Project House Q&A Photo Gallery General Discussion Construction Techniques Energy, Heating & Insulation Business Tools for Home Building Green Building Reader Classified Help Wanted Work Wanted Breaktime Fests The Woodshed Tavern The ArchivesHelp/Feedback
Forum Suggestions Feedback on Fine Homebuilding The Editor's CornerInspired House
General Discussion Reader Tips Interior Decorating Design Talk Building and Remodeling Ideas Kitchen and Bath Outdoor Living Material Choices Photo GalleryCurrent Issue
Member Visits
sapwood
-
5 min ago
xiaowdzaeq
-
10 min ago
w6erase5nt
-
12 min ago
rdesigns
-
22 min ago
wyny7ouys
-
37 min ago
gfretwell
-
38 min ago
tylercc
-
38 min ago
JIMMIEM
-
56 min ago
JoeJoyce
-
59 min ago
73lotus
-
1 hour ago
All How-To Topics



