failed framing inspection
I didn't fail my framing inspection today but I didn't pass it ether. Here's the deal. 2x6 wall framing, studs 24" o.c. all rafters stacked over studs. Nothing new there,…
-
shiming floor joists
Hi I'm setting a sub floor over an existing slab as part of an addition. I have no option but to use 2x6's on 16" centers if I'm to plain…
-
finding a short in electric radiant heat
Real quick here, the radiant floor was set over backer and tested good. The tile was set and grouted, then the floor tested bad. There is a short in the…
-
sanding marks in a fresh hardwood floor
Drum sander marks in a freshly laid/finished 3/4 oak floor. I gave the sub a chance to resand and finish but highly visable sanding marks remain. The installer is now…
-
pressure treated vs untreated
This question relates to material selection for an arbor/ pergola. The design calls for 2x6 in 16' lengths and 4x4 posts. As an exterior project pressure treated lumber would be…
-
drywall
I am a little unfamiliar with the cost of hanging and finishing drywall. Can any one out there give me a ball park idea, materials and labor.